cigbusinesssetup.ae

A UAE Manufacturing License allows businesses to legally operate within the UAE manufacturing industry, whether you’re assembling electronics, packaging food, or producing goods at scale. This license is required for any business that transforms raw materials into final products from factories to workshops, and it can be obtained through either mainland or free zones depending on your goals.

🛠️ How to Get a UAE Manufacturing License in 5 Steps

  1. Choose Product & Activity
    (e.g., packaging, assembly, fabrication)

  2. Decide Free Zone vs. Mainland
    Based on tax, ownership, and market access

  3. Reserve Trade Name & Submit Docs
    Includes business plan, lease, equipment list

  4. Obtain Required NOCs
    Civil Defence, Environmental, MOIAT approvals

  5. Get Your License Issued & Register with MOIAT

💰 UAE Business License Cost for Manufacturing

Here’s a cost breakdown for a typical manufacturing license in UAE:

Component Cost (AED)
Manufacturing License Fee 10,000 – 20,000
MOIAT Registration 1,000 – 2,500
Civil Defence / Environmental NOCs 1,000 – 5,000
Facility Lease 20,000 – 60,000+
Visa & Immigration 4,000 – 7,000 (per visa)
Total Estimated Setup Cost AED 35,000 – 120,000

Note: above mention is not actual cost, beware of that. 

📌 Quick Overview

✅ License Name Manufacturing License in UAE
🏭 Industry UAE Manufacturing Industry (Food, Steel, Plastics, Electronics)
📍 Jurisdiction Mainland (DED + MOIAT) / Free Zone (JAFZA, RAKEZ, etc.)
💼 Who Needs It? Anyone producing, assembling, or packaging goods in the UAE
💰 UAE Business License Cost Starting from AED 13,500 – AED 40,000+
🕒 Setup Time 10 to 21 working days after all approvals

⚙️ Why the UAE Manufacturing Industry is Booming

The UAE manufacturing industry contributes over AED 200 billion to the GDP and is the third-largest sector after oil and trade. Backed by:

  • Strategic locations (ports, airports)

  • Subsidized industrial zones

  • Zero tax in many free zones

  • Strong demand for locally made products

This makes 2025 the best time to launch a manufacturing business in the UAE.

⚖️ Free Zone vs. Mainland – Which Manufacturing License is Better?

Feature Mainland Free Zone
Market Access Full UAE & global Global only (UAE via distributor)
Ownership 100% foreign ownership 100% foreign ownership
Cost (License + Setup) AED 40,000 – AED 120,000 AED 25,000 – AED 90,000
Facility Type Warehouse + office required Ready-made industrial units available
Tax Benefits Subject to 9% tax (above AED 375K profit) 0% tax in compliant free zones
Best For UAE sales, scaling, heavy industries SMEs, exporters, simplified setup

❓ FAQs – UAE Manufacturing License

Is a manufacturing license mandatory in the UAE?
Yes. Any business producing, assembling, or packaging products needs this license from the DED or free zone authority.

Can I own the factory 100% as a foreigner?
Yes. The UAE allows 100% foreign ownership for industrial activities.

How long does it take to get a license?
Usually 2 to 3 weeks after facility approvals.

Which free zones are best for manufacturers?

  • RAKEZ (cost-effective for SMEs)

  • JAFZA (near Jebel Ali Port)

  • SAIF Zone (near Sharjah Airport)



LIMITED TIME OFFER | BUSINESS LICENSE IN AED 4,899

X